Post-development application


End of year submission cut off dates for 2026

We would like to provide the following advice to assist you in managing your lodgements and obtaining an outcome or certificate before the Christmas shutdown period, as outlined in the email to the industry issued on Thursday 8 October 2026:

  • Design Review (DR), Operational Acceptance (OA), Soft Landscape Consolidation Commencement (SLCC), Soft Landscape Handover (SLH) and Final Acceptance (FA) submissions should be lodged via ProjectWise prior to COB Friday 20 November 2026.
  • Operational Acceptance (OA) submissions* which include playgrounds, barbeques, bins, bubblers, and other contract / programmed maintenance items should be lodged via ProjectWise by COB Friday 6 November 2026.
  • Soft Landscape Handover (SLH) submissions* which include areas of open space, playgrounds, playing fields or irrigation should be lodged via ProjectWise by COB Friday 6 November 2026.
  • Development Application (DA) and Building Applications (BA) for Driveway, Stormwater and LMPP can be lodged via eDevelopment / smart form at any time. However, responses and timeframes will be paused between Monday 21 December 2026 to Sunday 10 January 2027**.

*The above scheduling is to ensure the sufficient time to arrange the inclusion of these elements on the maintenance programme of CED and their contractors.

**This is to align with Section 192 of the Planning Act 2023. Under Section 192 a ‘working day’ is any day that’s not a Saturday or Sunday, public holiday or between 20 December and 10 January (inclusive).

Please note we will make every effort to meet the target dates, however this may be subject to the volume of submissions received (particularly in the 2 weeks prior to Christmas shutdown) and the resource capacity availability. We will notify you accordingly and appreciate your support should we not be able to meet the targets.

All assets handed over to the Territory have to be designed and constructed in accordance with relevant specifications, guidelines, codes and content of post-development approval submissions.

Early works and design review

We review and audit some elements of the design for their compliance with relevant standards, guidelines and specifications, and issue letter of design review.

Operational acceptance

We assess the documentation and inspects the works to accept the handover of hard infrastructure assets for ongoing maintenance.

Soft landscape consolidation

We assess the documentation and inspect the works to establish if the soft landscape assets are ready to be placed onto consolidation.

Soft landscape handover

We assess the documentation and inspects the site to confirm that the soft landscape assets are satisfactorily established and can be handed over for ongoing maintenance.

Final acceptance

We assess the documentation and inspect the works to confirm that defects occurred during defects liability period have been satisfactorily rectified.

Asset assessment

How assets created during a development are assessed prior to handover.