End of year submission cut off dates for 2026
We would like to provide the following advice to assist you in managing your lodgements and obtaining an outcome or certificate before the Christmas shutdown period, as outlined in the email to the industry issued on Thursday 8 October 2026:
- Design Review (DR), Operational Acceptance (OA), Soft Landscape Consolidation Commencement (SLCC), Soft Landscape Handover (SLH) and Final Acceptance (FA) submissions should be lodged via ProjectWise prior to COB Friday 20 November 2026.
- Operational Acceptance (OA) submissions* which include playgrounds, barbeques, bins, bubblers, and other contract / programmed maintenance items should be lodged via ProjectWise by COB Friday 6 November 2026.
- Soft Landscape Handover (SLH) submissions* which include areas of open space, playgrounds, playing fields or irrigation should be lodged via ProjectWise by COB Friday 6 November 2026.
- Development Application (DA) and Building Applications (BA) for Driveway, Stormwater and LMPP can be lodged via eDevelopment / smart form at any time. However, responses and timeframes will be paused between Monday 21 December 2026 to Sunday 10 January 2027**.
*The above scheduling is to ensure the sufficient time to arrange the inclusion of these elements on the maintenance programme of CED and their contractors.
**This is to align with Section 192 of the Planning Act 2023. Under Section 192 a ‘working day’ is any day that’s not a Saturday or Sunday, public holiday or between 20 December and 10 January (inclusive).
Please note we will make every effort to meet the target dates, however this may be subject to the volume of submissions received (particularly in the 2 weeks prior to Christmas shutdown) and the resource capacity availability. We will notify you accordingly and appreciate your support should we not be able to meet the targets.
A nature strip is the land between a residential property boundary and the adjacent roadway. In Canberra, it is usually a patch of grass with trees and a footpath close to the property boundary. This land is publicly owned and not part of the neighbouring property.
Nature strips are sometimes referred to as street verges and may include rain gardens. This land often contains infrastructure for essential services like telecommunications, energy, water and wastewater.
Maintenance of nature strips is undertaken by the resident or lessee of the adjoining leased land.
You need approval to change a nature strip or store objects such as a skip or bin. You do not need approval to grow grass on your nature strip. However, any further landscaping or additions require approval.
Nature strip uses and approval process
The Guidelines for use of residential nature strips (PDF 3.1 MB) describe the types of activities which can be undertaken on the nature strip and whether they require approval. See below for a summary of the key guidelines and how to apply for approval.
Nature strip uses that are allowed and do not require approval:
- groundcovers, native grasses and shrubs up to 50cm in height (or 20cm in a Bushfire Prone Area) to help maintain line of sight
- compacted gravel on up to 50% of the nature strip (but not within the drip line of trees), with the remainder being low level shrubs or grass (this allows for water filtration and has a cooling effect)
- organic mulch materials (e.g. pine bark, pine chip and flake, chipper waste)
- temporary protective fencing for new grass/shrubs up to 13 weeks
- garden edging of stone, brick and timber up 15cm high.
Nature strip uses that require approval:
- irrigation systems, synthetic turf or bollards to prevent parking on the nature strip
- temporary storage of landscape material for longer than 2 weeks
- second driveway.
Nature strip uses that are unlikely to be approved:
- ponds, water fountains, permanent fencing, retaining walls, letterboxes, shipping containers, chicken runs, play equipment, boulders, pavers/concrete paths, new trees
- parking a vehicle (including cars, trailers and caravans) on the nature strip is prohibited.
Please note that applications must include a detailed site plan (to scale) of the proposed change. The site plan should include existing assets such as driveways and street trees and a legend of proposed materials to be used.
Apply for approval
To apply to change a nature strip, or place objects such as a skip or bin on a nature strip please complete the relevant application form:
- Nature strip development application form
- Application to place a skip/bin on public unleased land
To apply to place an object such as a skip bin on a nature strip, please complete the relevant application form. Applications should be completed and emailed to the Public land use team for processing. If you have difficulty with the form please contact 6205 9850.
To apply to change or modify a nature strip, please complete the relevant application form. Applications can only be accepted in electronic format and take 15 working days to assess. If you have difficulty with the form please contact CED.dcdevelopmentcoordination@act.gov.au
Related links
More information
Street trees
Street trees on the nature strip are maintained by the ACT Government. Residents are not permitted to plant, trim, prune or remove a street tree. For these requests, please contact Access Canberra on 13 22 81 or log an enquiry through Fix My Street.
Service impacts
Nature strips usually contain essential services such as:
- sewerage
- stormwater pipes
- telephone lines
- power
- gas.
Unapproved works or alterations to the nature strip may limit access or cause damage to these services. All costs for damage repairs will be at the expense of the resident or lessee. Changes such as tree plantings or landscaping require consultation and approval.
Maintenance
Maintenance of nature strips, including rain gardens, is undertaken by the resident or lessee of the adjoining leased land. This includes residential properties, single unit dwellings, body corporates and commercial premises.
If regular maintenance is not possible due to health reasons, organisations such as a Home Help Services ACT may be able to help. Call Access Canberra on 13 22 81 for more information.
Rain gardens
A rain garden is a bio-retention basin installed on an urban street. It is a water sensitive urban design measure to improve water quality downstream. The rain garden helps to filter storm water before it enters larger basins such as lakes and ponds. Rain gardens rely on bio-filtration processes to reduce stormwater pollutants.
Well-maintained rain gardens
Look after your rain garden and make sure it is working well by:
- hand pulling weeds without use of chemicals,
- clearing debris such as litter, grass clippings and organic materials.
This will allow stormwater to be filtered as it passes through the soil profile.
The photos below show well-maintained rain gardens. Rain gardens should have good vegetation, and both weeds and leaf litter removed.
Poorly maintained rained gardens
The photos below show poorly maintained rain gardens overrun by weeds and leaf litter.
Lawn clippings in the garden have resulted in a decline in native vegetation and the introduction of weeds. Lawn clippings also slow the rate at which water passes through the soil.
Contact us
Please contact us via email if you have any questions.
Page updated 04 Oct 2023