A Landscape Management and Protection Plan shows the protection and management of the Territory’s assets on the verge during construction works. Assets typically include trees, grass, footpaths, kerb and gutter, public lighting, stormwater sumps etc.
It is important that a Landscape Management and Protection Plan is prepared in accordance with Transport Canberra and City Services Reference Document 4 (PDF 117KB), and Landscape Management and Protection Plan Advisory Note (PDF 290KB). These documents are intended to ensure the safety of the public and protection of Territory assets during construction works.
Application forms
When a Landscape Management and Protection Plan is required as a part of a Development Application or Design Acceptance submission it must be submitted together with the submission documents.
When a Landscape Management and Protection Plan is required for building application (driveways, stormwater easements and waste and recycling management assessments) it must be submitted at the same time and lodged via the TCCS approval form.
When submitting the Landscape Management and Protection Plan you must attach the following documents:
- landscape management and protection plan
- dilapidation report.
For Early Works Submissions, please visit the Early works page for more information.
Landscape management and protection plan
Before you start construction activity you are required to submit a plan showing how you are going to protect Territories assets in the proximity of the construction activity relating to your development.
The Landscape Management and Protection Plan must include the following:
- property boundary
- road kerb line
- road name you are accessing from and to
- tree type, height, canopy size and distance from the driveway
- show the proposed location of fencing to protect all verge plantings, trees and grassing.
The Landscape Management and Protection Plan must meet the following requirements:
- all Territory assets on the nature strip (trees, grass and infrastructure) must be protected
- all existing verge footpaths and driveways shall remain unobstructed throughout the construction period to provide safe pedestrian movement
- temporary fencing to be 1800mm tall continuous mesh fence supported by steel posts with concrete bases
- the verge and open space must not be used for storage of materials unless the permit from Transport Canberra and City Services has been obtained
For information on what needs to be included in the plans, please view the sample site plan (PDF 1,137KB).
Dilapidation report
The dilapidation report must show infrastructure and services within the area of the project including adjacent open space, that may be affected by construction activities such as parking, unloading and delivery of materials and heavy machinery.
The report is to contain map of the area cross referenced with close up photos of identified defects.
For information on what needs to be included in the report, please view the nature strip page.