The Municipal Infrastructure Technical Specifications (MITS) utilise the AusSpec document framework. This framework provides a level of design consistency across all local government jurisdictions in Australia, and reflects the most up-to-date industry practice. A number of local and regional government jurisdictions have adopted the AusSpec document framework as the primary technical framework for their design standards.
The ACT Government has adopted the AusSpec document framework. Each of the MITS documents provide detailed ACT specific technical construction guidance for civil and open space assets as well as references to a number of relevant construction documents. The MITS documents have been designed to be read in conjunction with these relevant referenced construction documents.
The construction of municipal assets in the ACT must be in accordance with the Municipal Infrastructure Technical Specifications. Where any differences in practice exist between referenced construction documents and the Municipal Infrastructure Technical Specifications, the later will prevail.
For documents related to design refer to the Municipal Infrastructure Design Standards (MIS) website. For standard drawings refer to the Municipal Infrastructure Standard Drawings.
Preface and Guidance Documents
These documents should be read and used in conjunction with the MITS.
- Preface (PDF 153.1 KB)
- Version Tracking sheet
Municipal Infrastructure Technical Specification (MITS)
MITS 00 Preliminaries
- MITS 00A General Requirements (PDF 592.6 KB)
- MITS 00B Quality Construction (PDF 1.5 MB)
- MITS 00C Control of Erosion and Sedimentation (PDF 517.6 KB)
MITS 01 Traffic Management
- MITS 01 Traffic Management (PDF 483.2 KB)
MITS 02 Earthworks
- MITS 02A Clearing and Grubbing (PDF 464.5 KB)
- MITS 02B Bulk Earthworks (PDF 643.6 KB)
- MITS 02C Stabilisation (PDF 480.9 KB)
MITS 03 Underground Services
- MITS 03A Trenching for Underground Services (PDF 1.3 MB)
- MITS 03B Pipe Drainage (PDF 853.9 KB)
- MITS 03C Precast Box Culverts (PDF 910.2 KB)
- MITS 03D Drainage Structures (PDF 1.3 MB)
- MITS 03E Water Supply Reticulation (PDF 471.7 KB)
- MITS 03F Sewerage Systems Reticulation (PDF 488.1 KB)
- MITS 03G Service Conduits (PDF 536.2 KB)
- MITS 03H Road Openings and Restorations (PDF 626.3 KB)
- MITS 03I Subsurface Drainage (PDF 566.9 KB)
- MITS 03J Subsoil and Foundation Drains (PDF 489.6 KB)
- MITS 03K Drainage Mats (PDF 2.0 MB)
MITS 04 Flexible Pavements
- MITS 04 Flexible Pavements (PDF 593.1 KB)
MITS 05 Sportsgrounds
- MITS 05A Sportsground Pavilions (PDF 801.9 KB)
MITS 06 Concrete Kerbs, Open Drains and Paving Works
- MITS 06A Concrete Kerbs and Open Drains (PDF 1.3 MB)
- MITS 06B Concrete Paths, Driveways and Medians (PDF 1.4 MB)
MITS 07 Segmental Paving
- MITS 07 Segmental Paving (PDF 1.1 MB)
MITS 08 Incidental Works
- MITS 08A Fences and Barriers (PDF 2.5 MB)
- MITS 08B Play Equipment and Organic Surfacing (PDF 559.1 KB)
- MITS 08C Rubber Impact Attenuating Surface (PDF 488.7 KB)
- MITS 08D Furniture and Fixtures (PDF 3.6 MB)
MITS 09 Landscape
- MITS 09A Topsoil (PDF 469.1 KB)
- MITS 09B Grassing (PDF 549.8 KB)
- MITS 09C Planting (PDF 524.0 KB)
- MITS 09D Irrigation (PDF 455.6 KB)
- MITS 09E Consolidation (PDF 520.9 KB)
MITS 10 Concrete for General Works
- MITS 10 Concrete for General Works (PDF 1.7 MB)
MITS 11 Line Marking
- MITS 11 Line Marking (PDF 725.8 KB)
MITS 12 Public Lighting
- MITS 12 Public Lighting (PDF 3.1 MB)
MITS 13 Traffic Signals
- MITS 13 Traffic Signals (PDF 698.4 KB)
MITS 14 Road Signs
- MITS 14 Road Signs (PDF 781.1 KB)
MITS 15 Street Furniture
- MITS 15A Guide Posts (PDF 2.2 MB)
- MITS 15B Non-Rigid Safety Barrier Systems (PDF 879.6 KB)
- MITS 15C Rigid Road Safety Barrier Systems (PDF 881.7 KB)
MITS 16 Stormwater
- MITS 16A Bioretention Systems (PDF 3.0 MB)
- MITS 16B Ponds (PDF 1.7 MB)
- MITS 16C Wetlands (PDF 2.6 MB)
- MITS 16D Gross Pollutant Traps (PDF 2.6 MB)