Current update

Construction is well underway to deliver the new playground in Watson. Construction commenced in July 2024 and is expected to be complete in mid-2025 (weather and site conditions permitting).

A temporary construction vehicle access point has been created off Burton Street.

Most of the work will be carried out as day works on weekdays from 7 am to 5 pm and, if required, on weekends from 8 am to 4 pm.

Construction update April 2025

All play equipment has been installed.

Over 100 tree pits are being dug to get ready for planting.

Work to install the rubber softfall and playground mulch has started.

Line marking and painting is underway for the multi-use courts and a tennis net has been installed at one of the courts.

Concrete paths are taking shape which will connect to the surrounding path network.

Further updates will be provided on this page closer to the playground opening.

Page last reviewed 13 May 2025

Project description

Construction is underway on Inner North playground.

The ACT Government is delivering a new destination style playground for the inner north. It will be located in the green space adjacent to Canberra Technology Park in Watson. The playground will provide recreation options for people of all ages and abilities. It will cater to nearby schools, childcare centres and residents of the inner north.

The community was engaged on the design between October 2021 and October 2023. For more information on the consultation including feedback summaries visit YourSay.

Key features

  • junior play area with a variety of play equipment
  • accessible play route linking a network of accessible play equipment
  • grassed amphitheatre
  • 2 multi-use courts
  • 108 new tree plantings
  • 32 bike parking spaces across four locations
  • a bike repair station equipped with an air pump and tools
  • picnic shelters and accessible seating
  • barbecues, drinking fountain and bins
  • fitness zone with strength and circuit training equipment
  • accessible path network
  • 18 car parking spaces including 2 accessible parking spaces
  • one accessible toilet and change room with baby change facilities
  • 3-phase power
  • shipping container for local community groups to utilise and store equipment.

The Glossy Black-Cockatoo and its habitat has inspired the inner north playground design. The striking features of these cockatoos and their local habitat will guide the colours used across the playground.

Traffic and pedestrian access

There are no road closures anticipated to be required during these works however there may be temporary traffic changes such as reduced speed limits to allow construction vehicles safe entry and exit from the worksite.

There will be no access to this area for the public while construction is underway. Pedestrians and cyclists are asked to be mindful of the construction site, follow detour signs where required and do not enter the construction zone.

Construction photos

The images below show the construction site in March 2025 and April 2025. Click on an image to view full screen.

March 2025 aerial shot of construction site April 2025 aerial shot of construction site

Design

Click on the image below to view the final design (PDF 662.9 KB).

map showing the locations of the upgrades

Related links

Stay updated

If you’d like to stay updated on this project, bookmark this page or email us at communityengagement@act.gov.au to be included on any project updates.