- 135 metre long and 1.5 metre wide concrete path and new kerb ramps from the end of Bluebell Lane to the Moorhouse Street/Pedder Street intersection next to the O’Connor Oval.
- 405 metre long and 1.5 metre wide concrete path to replace the existing damaged path along the south side of the parklands from Miller Street to Busby Street. This will also include minor repairs to section of concrete path running through the amphitheatre section and upgrade of 3 existing bench seats.
- Repairs and new kerb ramps adjacent the intersection of Hart Street and Tate Street including two 1.5 metre wide paths totalling approximately 7 metres in length.
- Construction of a new 3 metre long and 1.5 metre wide path to the bus stop at Macpherson Street including kerb ramp upgrades in front of the O’Connor shops.
- Replacement of sections of concrete path damaged by tree roots in five locations along Quinn Street (approximately 15 metres of path).
Hart Street, near the corner of Tate Street
- Replacement of 4 kerb ramps
- Removal of 2 pathway links including replacing kerb ramps with kerb
- Maintenance of existing pathway connections
Macpherson Street, near bus stop
- Bus stop works:
- Repair/replacement of existing pathway that is displaced at entrance to bus stop
- Replacement of sump that is damaged
- Removal of redundant kerb ramp
- Relocation of tactile to be in the correct location
- Replacement of manhole cover to ensure that it is flush with new pathway level.
- Kerb ramp near coffee shop:
- New pathway link on northern side to new kerb ramp location
- Upgrade the 2 existing kerb ramps to current standard and ensure that they align with each other
- Relocation of speed sign to be at least 0.5 metres off new kerb ramp/pathway.
Quinn St on east and west sides:
- Two new kerb ramps including associated concrete link to existing paths.
For more information see the O'Connor site works plan (PDF 1.8 MB).