Age Friendly Suburbs Program


Page last reviewed 06 Mar 2025

Project description

Complete: Age Friendly Suburbs Program.

The Age Friendly Suburbs Program aims to improve path networks and provide better access for the aged community and those with more specific mobility needs. These improvements benefit all Canberrans.

Improvements have been delivered in 12 suburbs since the program commenced in 2015-16. You can find more details on the previous projects page.

The ACT Government identifies improvements through Fix My Street data and site visits. We also talked to community groups including Council of the Ageing. The community helped prioritise improvements for further investigation in these suburbs in October 2022. See YourSay for more information on the consultation.

Below is a list of completed works.

Completed works

  • 160 metre long and 1.5 metre wide concrete path including a new kerb ramp connecting Riley Close with the main path network running from Gungahlin Drive to the Tuggeranong Parkway.
  • 88 metre long and 1.5 metre wide concrete path linking to the main community route near the open space between Anderson Drive and the Hindmarsh Drive/Melrose Drive intersection. This includes 40 metres of new path and reconstruction of an existing 48 metres of path located on Anderson Street. Includes 3 kerb ramps.
  • 60 metre long and 1.5 metre wide concrete path including one new kerb ramp connecting Lyle Close with the main path network running from Gungahlin Drive to the Tuggeranong Parkway.
  • 68 metre long and 1.5 metre wide concrete path and kerb ramps linking to the local community route at the open space behind the Plunkett Street and Maclaurin Crescent intersection.
  • 80 metre long and 1.5 metre wide concrete path including one new kerb ramp connecting D’Arcy Place with the main path network running from Gungahlin Drive to the Tuggeranong Parkway.
  • Demolition of the 4 metre long damaged concrete path on Eggleston Crescent, adjacent to the Coghlan Street intersection, to discourage unsafe crossing. Area to be replaced with topsoil and grassing.
  • 41 metre long and 1.5 metre wide concrete path following a desire line through the open space adjacent to the MacFarland Crescent/ Eggleston Crescent intersection and linking to existing community route.
  • New pedestrian refuge (concrete median cut-out) near the MacFarland Crescent/Eggleston Crescent intersection and 2 kerb ramp upgrades.
  • 40 metre long and 1.5 metre wide concrete path following the desire line in the open space adjacent to the MacFarland Crescent/Waldock Street intersection. This will create a link between the main and local community routes.
  • Reconstruction of 2 existing kerb ramps and construction of 2 new kerb ramps, new linemarking, concrete path upgrades and relocation of the existing seat at the Chifley local shops car park.
  • Approximately 24 metre long and 1.5 metre wide concrete path connecting Gleddon Street including new kerb ramp to the existing community path network.
  • Connection from Gleddon Street and existing Main Community Route - new kerb ramp and new 1.5 metre wide path to connect to existing main asphalt community route.

For more information see the Chifley site works plan (PDF 4.3 MB).

Completed works

  • 135 metre long and 1.5 metre wide concrete path and new kerb ramps from the end of Bluebell Lane to the Moorhouse Street/Pedder Street intersection next to the O’Connor Oval.
  • 405 metre long and 1.5 metre wide concrete path to replace the existing damaged path along the south side of the parklands from Miller Street to Busby Street. This will also include minor repairs to section of concrete path running through the amphitheatre section and upgrade of 3 existing bench seats.
  • Repairs and new kerb ramps adjacent the intersection of Hart Street and Tate Street including two 1.5 metre wide paths totalling approximately 7 metres in length.
  • Construction of a new 3 metre long and 1.5 metre wide path to the bus stop at Macpherson Street including kerb ramp upgrades in front of the O’Connor shops.
  • Replacement of sections of concrete path damaged by tree roots in five locations along Quinn Street (approximately 15 metres of path).

Hart Street, near the corner of Tate Street

  • Replacement of 4 kerb ramps
  • Removal of 2 pathway links including replacing kerb ramps with kerb
  • Maintenance of existing pathway connections

Macpherson Street, near bus stop

  • Bus stop works:
    • Repair/replacement of existing pathway that is displaced at entrance to bus stop
    • Replacement of sump that is damaged
    • Removal of redundant kerb ramp
    • Relocation of tactile to be in the correct location
    • Replacement of manhole cover to ensure that it is flush with new pathway level.
  • Kerb ramp near coffee shop:
    • New pathway link on northern side to new kerb ramp location
    • Upgrade the 2 existing kerb ramps to current standard and ensure that they align with each other
    • Relocation of speed sign to be at least 0.5 metres off new kerb ramp/pathway.

Quinn St on east and west sides:

  • Two new kerb ramps including associated concrete link to existing paths.

For more information see the O'Connor site works plan (PDF 1.8 MB).

Completed works

  • 55 metre long and 1.5 metre wide concrete path, through the open space between Barlow Street and Levien Street, past the Levien Street playground. This replaces an existing path. Also includes kerb ramps and the relocation of park benches.
  • 36 metre long and 1.5 metre wide concrete path. This path will be located in the open space between the Hargrave Street playground and the Broadsmith Street/Hargrave Street intersection.
  • 100 metre long and 1.5 metre wide concrete path. This path will link the Southern Cross Drive underpass and the Southern Cross Drive/Ross Smith Crescent intersection.
  • 62 metre long and 1.5 metre wide concrete path. This formalises a desire line through the open space between Kingsford Smith Drive and the Hinkler Street/Ulm Street intersection.
  • 38 metre long and 1.5 metre wide concrete path and pedestrian refuge at the intersection of Mackinolty Street and Ross Smith Crescent. Replaces the existing non-compliant infrastructure.
  • 11 metre long and 1.5 metre wide concrete path on Chewings Street nearby house numbers 37 and 38.
  • 80 metre long and 1.5 metre wide concrete path. This formalises a desire line connecting the Frewin Place car park with Belconnen Way.
  • Approximately 50 metre long and 1.5 metre wide concrete path connection from McGiness Street to existing path adjacent to Keith Street including approximately 6 metres of path repair.

Keith Street northern verge 

  • Replace 2 kerb ramps at intersection Keith and McGinness St and provide complaint kerb ramps
  • Provide a new 1.5m pathway link from the intersection to the existing pathway near 6 Keith Street. The new pathway should be as close to the block boundary as possible to avoid the existing streetlights (behind streetlights, substation etc)
  • At the connection to the existing the path may need to be narrowed to 1.2m and a new concrete hob provided due to the levels of an existing tree
  • When pathway goes through driveway jointing is to be provided to promote pedestrian priority.

Please note: the below sites have been amended following the initial release of final locations in July 2023. The concrete paths through Dirrawan and Gerrilong gardens were removed after additional community feedback was received on their inclusion against their construction.

All of the below locations were subject to and have received ACT Heritage approval.

Completed works

  • Repair/replace the existing concrete path at the post-box on Currong Street (nearby house number 14).
  • Upgrade the existing paths and kerb ramps at the intersection of Currong and Coranderrk streets to current standards.
  • Upgrade the concrete pavement and connecting paths at two existing bus stops on Gooreen Street between Allambee and Corranderrk streets.
  • Upgrade the concrete pavement and connecting paths at bus stop on Euree Street between Currong and Elimatta streets.
  • Provide a new concrete path connection and associated kerb ramps across Amaroo Street, connecting to the existing path through the car park at St John the Baptist's Anglican Church.
  • Replacement of two bus stops, including concrete paving and path connections on Currong Street before/after ANZAC Park (bus route 55).
  • 10 metre long and 1.2 metre wide concrete path and two new kerb ramps nearby house numbers 13 and 15 on Booroondara Street.
  • 12 metre long and 1.2 metre wide concrete path and two new kerb ramps nearby house numbers 42 and 44 on Booroondara Street.
  • Replacement of existing bench seats in Geerilong Gardens.

For more information see the Reid site works plan (PDF 2.2 MB).