Materials Recovery Facility


Current update

A Request for Procurement for the finance, design, construct, operate and maintain contract is currently under evaluation. A contract is expected to be awarded in the second quarter of 2024.

Page last reviewed 05 Apr 2024

Project description

Planning is underway on Materials Recovery Facility.

Environment and planning approvals are underway as design work progresses for a new Materials Recovery Facility. The facility will be located on the same site as the existing facility on Recycling Road in the Hume Resource Recovery Estate. The new facility is being delivered as a priority and designed to have an increased processing capacity of up to approximately 115,000 tonnes per year. This will provide for future growth and population increases in the ACT and surrounding region.

The existing Materials Recovery Facility was extensively damaged by a fire in December 2022 and the facility is no longer operational. The main shed is still standing and planned to be demolished and the remainder of the site is currently being used as a waste transfer station to accept recycling, and sort and store materials before they are transported interstate to other processing facilities.

While construction of a new facility was being progressed despite the fire, it is now vital that construction is prioritised to ensure the ACT’s recycling can be processed locally and allow the temporary long-haul transport arrangements in place to cease.

The existing facility will be replaced with a new facility that will provide technological improvements to increase resource recovery, creating higher quality recycled products and reducing the amount of waste ending up in landfill.

The new facility is a central part of the ACT Circular Economy Strategy 2022-25 (PDF7.8 MB). The circular economy aims to keep resources circulating in our economy for as long as possible, maximising the value of materials and reducing the need to use natural resources.

Key features

Environmental and planning approvals

An Environmental Impact Statement (EIS) is required for this facility. The EIS considers all environmental, social and economic impacts associated with the proposal and ensures any adverse impacts are avoided, minimised and mitigated.

In the first half of 2023 engagement was undertaken with the community as part of the initial planning for the EIS. A draft EIS has been lodged with the Planning Authority and has been publicly notified. The public notification period was open until Monday 16 October 2023. The draft EIS is now under assessment. You can review the documentation on the Planning website.

A development application will also be required for the facility and will have a public notification period as part of its approvals. This is anticipated to occur in 2024.

Resources

Below is some additional information about key components of the new Materials Recovery Facility and the EIS documentation.

Odour and dust generation

  • An air quality impact assessment was undertaken as part of the draft Environmental Impact Statement and is available at Appendix M in the documentation.
  • The assessment found all proposed activities to be acceptable from an air quality perspective.
  • The Materials Recovery Facility will not be sorting or processing any decomposing matter or biodegradable wastes, and odour emissions are expected to be minimal.
  • The main sources of odour will be generated from incoming trucks delivering recycling, residual waste after processing and the receival of any non-compliant loads.
  • Some dust may be generated from delivering, sorting, crushing and processing recycling, similar to existing operations.
  • Trucks entering and leaving the site may also be a source of dust.

Mitigation and management

  • The facility will be fully enclosed and storage areas provided (subject to detailed design).
  • If required, dust collectors will be used in any areas which regularly emit a large amount of dust.
  • Dust will be minimised during construction of the facility with appropriate dust mitigation and management measures.

Noise generation

  • A Noise and Vibration Impact Assessment has been prepared for the draft EIS and is available at Appendix O in the documentation.
  • Noise levels are expected to be similar to, and not expected to exceed, the levels generated by the original Materials Recovery Facility.
  • The operational times will be determined by the contractor, however, it is expected the hours will be similar to the original facility and be consistent with the surrounding industrial environment. Operating hours will be specified in the development approval conditions.
  • The main sources of noise will be during operational hours and generated from the machinery associated with sorting material, crushing glass and incoming and outgoing trucks.

Mitigation and management

  • As part of the Noise and Vibration Assessment for the Materials Recovery Facility, management or mitigation measures will be developed (if required) during the detailed design stage to ensure the facility’s operational activities comply with the relevant guidelines and legislation of the ACT.

Visual impacts

  • A Landscape and Visual Impact Assessments has been undertaken as part of the draft EIS. It is available at Appendix G in the EIS documentation.
  • The new facility is to be located within the Hume Industrial Estate landscape character zone and impacts on this existing landscape character were assessed as low.
  • Impacts to other landscape character zones within vicinity were assessed as negligible.
  • This is due to views being commonly screened or filtered by surrounding built form, topography and/or vegetation. Furthermore, the proposed infrastructure components are similar in scale, height and character to the existing Materials Recovery Facility and surrounding existing infrastructure.

Traffic generation and parking

  • The facility will generally operate from Monday to Friday, coinciding with truck deliveries from household bin collections and the loading and transportation of processed products.
  • Peak times for truck traffic will typically be between 7.30 am to midday, and 1.30 pm to 5 pm weekdays. Weekend use of the facilities is not yet determined and will be subject to the operator.
  • During operation at full capacity, the facility is expected to generate the following vehicle movements during peak hour:
    • Heavy vehicles: 16 vehicle movements (eight inbound and eight outbound)
    • Light vehicles: 30 vehicle movements (15 inbound in the AM, 15 outbound in the PM).
  • All up it is estimated to be around 131 inbound and 131 outbound heavy vehicles per day which is approximately 60 more than currently experienced. However it is also important to note whilst the new facility is being designed to operate with a full processing capacity of 115,000 tonnes, it is unlikely to operate with that capacity from day one. This is due to the additional processing capacity accounting for future growth in Canberra and the surrounding region for 20 years from the operation of the new facility.
  • Access to the facilities will be via the existing road network including Recycling Road and John Cory Road.
  • Parking for employees and visitors to the Materials Recovery Facility will be provided within the site.

Mitigation and management

  • The Traffic Impact Assessment has looked at the existing traffic and assessed the impact of the new facilities and determined both construction and operation of the facility will have minimal impact on the road network when compared to its current performance.
  • It is noted once the facility is operating at full capacity, potentially 20 years from the operation of the new facility, the future upgrades along the Monaro Highway in this section are anticipated to be constructed and will improve the current performance of the network dramatically.
  • Two car parking areas are proposed within the Materials Recovery Facility accounting for 44 parking spaces including two mobility impaired spaces. It is expected this would accommodate the staff and visitor parking demands associated with the operation of the Materials Recovery Facility.
  • In addition, a dedicated space would be provided within the Materials Recovery Facility adjacent to the educational facility for buses.

Procurement

A Request for Procurement for the finance, design, construct, operate and maintain contract is currently under evaluation. A contract is expected to be awarded in the second quarter of 2024.