Reference number | Date of application | Information requested | Information provided | Date of decision | Fees paid or waived | Time spent on application | Ombudsman decision (if relevant) | ACAT decision (if relevant |
|---|
24-002 (PDF 49.3 MB) |
05/01/2024
|
Transport Canberra branding/visual design style guide and signage design style guide
|
Full access
|
Application withdrawn on 12/02/2024
|
N/A
|
25 days
|
N/A
|
N/A
|
24-007 (PDF 7.1 MB) |
17/01/2024
|
All documents between TCCS and Evoenergy concerning or related to the development of a substation on or in the vicinity of 26 Jacka Crescent, Campbell.
|
Partial access
|
12/03/2024
|
N/A
|
38 days
|
N/A
|
N/A
|
24-010 (PDF 462.9 KB) Attachment A (XLSX 95.4 KB)
|
25/01/2024
|
Current Community Path Infill Program List and supporting documents
|
Full access
|
01/03/2024
|
N/A
|
25 days
|
N/A
|
N/A
|
24-011 (PDF 450.7 KB)
|
29/01/2024
|
Document that shows the operating loss (or profit) of stage 1 of the Light Rail Project 2020 to 2021
|
Refusal
|
08/08/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
| 24-012 (PDF 1.0 MB)
| 02/02/2024 |
Traffic Studies from 2019 for Southern Cross Drive, Beaurepaire Crescent and Pickworth Street
|
Full access
|
18/03/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-013 (PDF 1.8 MB)
| 05/02/2024 |
Maintenance and monitoring of the footpath located in front of the Melbourne building from 1 January 2021
|
Partial access
| 18/03/2024 |
N/A
|
29 days
|
N/A
|
N/A
|
24-014 (PDF 4.7 MB)
|
06/02/2024
|
A copy of Public Transport Facility Management Agreement (Westfield), reports, complaints, correspondence, and upgrades
|
Partial access
|
15/04/2024
|
Waived
|
46 days
|
N/A
|
N/A
|
24-015 (PDF 2.9 MB) Deferred – folio 1 and 2 (PDF 666.5 KB) |
12/02/2024
|
Results of TCCS staff satisfaction surveys since 2020
|
Partial access
|
23/05/2024
|
N/A
|
69 days
|
N/A
|
N/A
|
| 24-017 (PDF 8.5 MB)
|
13/02/2024
|
All documents related to the footpath on 39 Ainslie Place, Canberra ACT
|
Partial access
|
26/03/2024
|
N/A
|
29 days
|
N/A
|
N/A
|
| 24-020 (PDF 3.7 MB)
|
20/02/2024
|
All complaints made on transport (bus and tram) services on weekends from the start of 2023
|
Partial access
|
19/04/2024
|
N/A
|
40 days
|
N/A
|
N/A
|
| 24-022 (PDF 55.6 MB)
|
21/02/2024
|
All communication, documents, briefings or any other material or forms of communication regarding FOI application 23-150
|
Partial access
|
08/04/2024
|
Waived
|
30 days
|
N/A
|
N/A
|
24-024 (PDF 973.7 KB) |
29/02/2024
|
Data relating to tree re-route decisions (re Urban Tree Management Audit)
|
Full access
|
12/04/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
| 24-030 (PDF 7.6 MB)
|
13/03/2024
|
Tender evaluations GS3538978 (Mugga Lane and Mitchell Reusable Facilities)
|
Partial access
|
21/06/2024
|
N/A
|
67 days
|
N/A
|
N/A
|
24-031 (PDF 4.3 MB)
| 12/03/2024 |
CRM enquiries, defect reports etc Weston ACT
|
Partial access
| 01/05/2024 |
N/A
|
33 days
|
N/A
|
N/A
|
24-044 (PDF 484.1 KB) |
01/04/2024
|
Information in relation to TCCS DAS and Animal Nuisance complaints
|
Full access
|
03/06/2024
|
N/A
|
42 days
|
N/A
|
N/A
|
24-046 (PDF 818.9 KB) |
04/04/2024
|
Belconnen Westfield Bus Station quarterly maintenance reports
|
Full access
|
03/06/2024
|
N/A
|
40 days
|
N/A
|
N/A
|
| 24-047 (PDF 433.6 KB)
|
21/06/2024
|
All ACT Government urban maintenance activities carried out since 1 July 2018
|
Refused to deal
|
20/08/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-050 (PDF 279.3 KB)
|
08/04/2024
|
Annual weighbridge totals, including both Mugga Lane and Mitchell RMC transfer stations
|
Full access
|
17/06/2024
|
N/A
|
47 days
|
N/A
|
N/A
|
24-051 (PDF 7.1 MB) |
09/04/2024
|
Any dilapidation reports regarding the demolition of block 4 Section 12 or 40 Allara Street
|
Partial access
|
05/06/2024
|
N/A
|
39 days
|
N/A
|
N/A
|
24-052 (PDF 384.1 KB)
|
10/04/2024
|
Statistics relating to injury caused by contact with animals, specifically dogs between July 2012 to June 2022
|
Full access
|
23/05/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-053 (PDF 253.7 KB)
|
11/04/2024
|
Revenue generated by Go Transit and Ooh Media advertising related to Brindabella Christian College since 2019
|
Refused
|
12/06/2024
|
N/A
|
41 days
|
N/A
|
N/A
|
| 24-054 (PDF 523.0 KB)
|
11/04/2024
|
The installation date and location of all speed limit signs on Gungahlin Drive January 2024 to April 2024
|
No documents
|
15/05/2024
|
N/A
|
23 days
|
N/A
|
N/A
|
24-056 (PDF 616.7 KB)
|
17/04/2024
|
All records relating to the footpath located in the vicinity of 2-10 Captain Cook Crescent
|
Partial access
|
29/05/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-057 (PDF 1.2 MB) |
19/04/2024
|
All documents held by TCCS from 28 April 2015 -28 April 2024 relating to the pavers between Kippax Public Library and Kippax Fair: maintenance, repair, notifications, complaints, photos, videos etc
|
Partial access
|
12/06/2024
|
N/A
|
35 days
|
N/A
|
N/A
|
24-058 (PDF 1.6 MB)
|
23/04/2024
|
All records relating to maintenance, upkeeping, monitoring and repair of the median strip located to the north of the roundabout between Kingsford Smith Drive and Belconnen Way
|
Not held
|
12/06/2024
|
N/A
|
32 days
|
N/A
|
N/A
|
24-060 (PDF 2.9 MB)
|
24/04/2024
|
ACT Government offered subsidy for ride share (mostly Uber) associated with general public venues like Multicultural Festivals
|
Partial access
|
28/06/2024
|
N/A
|
44 days
|
N/A
|
N/A
|
24-062 (PDF 2.4 MB)
|
30/04/2024
|
Steps being taken to ensure visibility of parking signs in Easty Street car park
|
Partial access
|
23/05/2024
|
N/A
|
17 days
|
N/A
|
N/A
|
24-063 (PDF 293.8 KB) |
01/05/2024
|
ACT City Services installation of a sprinkler system for the nature strip at the frontage of 39 Braybrooke Street
|
Not held
|
12/06/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-065 (PDF 272.7 KB)
|
03/04/2024
|
Any documents if anyone has fallen over on the nature strip on Buckland Street Mitchell ACT
|
Not held
|
14/06/2024
|
N/A
|
49 days
|
N/A
|
N/A
|
24-068 (PDF 1.7 MB)
|
08/05/2024
|
Documents held by Transport Canberra and City Services that relate to animals used and bred for research and teaching.
|
Partial access
|
22/07/2024
|
N/A
|
51 days
|
N/A
|
N/A
|
24-069 (PDF 2.1 MB)
|
09/05/2024
| Reports of defects, maintenance requests, and reports of maintenance on the grass and sidewalks outside of Manuka Oval |
Partial access
|
27/06/2024
|
N/A
|
33 days
|
N/A
|
N/A
|
24-070 (PDF 482.0 KB)
|
9/05/2024
|
Any/all emails (including deleted emails) sent by specified employee from January 2016 until May 2024
|
Refused
|
23/07/24
|
N/A
|
50 days
|
N/A
|
N/A
|
24-072 (PDF 364.0 KB)
|
10/05/2024
|
Fix my street submissions and repairs to the road on Torrens Street/ Girrahween Street Braddon
|
Partial access
|
21/06/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-073 (PDF 482.0 KB)
|
10/05/2024
|
Any/all emails (including deleted emails) sent by specified employee from January 2016 until May 2024
|
Refused
|
23/07/24
|
N/A
|
50 days
|
N/A
|
N/A
|
24-076 (PDF 242.8 KB)
|
17/05/2024
|
TCCS priority footpath list as of November 2023
|
Already available
|
01/07/2024
|
N/A
|
29 days
|
N/A
|
N/A
|
24-077 (PDF 325.5 KB) |
20/05/2024
|
Deliverables associated with three contracts re Parks Way
|
Refused
|
07/08/2024
|
N/A
|
55 days
|
N/A
|
N/A
|
24-078 (PDF 222.8 KB) |
20/05/2024
|
Traffic studies/traffic surveys that involve Krefft Street, Florey, from 2009 to present
|
Refused
|
01/07/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-079 (PDF 2.8 MB)
|
22/052024
|
Documents relating to TTM 22098 and work order WO71672
|
Partial access
|
01/07/2024
|
N/A
|
26 days
|
N/A
|
N/A
|
24-082 (PDF 43.2 MB)
|
29/05/2024
|
All documents held by the tree Protection Unit related to the removal of, or protection of, trees at BCC
|
Partial access
|
17/07/2024
|
N/A
|
34 days
|
N/A
|
N/A
|
24-083 (PDF 449.0 KB)
|
31/05/24
|
All records relating to the maintenance, upkeep, monitoring, and repair of the footpath located in the vicinity of Aranda Preschool
|
Full access
|
01/07/2024
|
N/A
|
20 days
|
N/A
|
N/A
|
24-084 (PDF 270.9 KB)
|
29/05/2024
|
Tender decision and the reasons why TGS was not granted an extension
|
Refused access
|
09/07/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-089 (PDF 2.4 MB)
|
14/07/2024
|
Records between 2018-20 relating to the footpath and pedestrian crossing located in the vicinity of 175 Anketell Street in Greenway
|
Partial access
|
08/08/2024
|
N/A
|
39 days
|
N/A
|
N/A
|
| 24-092 (PDF 229.1 KB)
|
18/06/2024
|
Traffic study documents relating to O'Reilly Street in Macgregor
|
Not held
|
30/07/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-094 (PDF 1.9 MB)
|
24/06/2024
|
Records associated with the dirt BMX track located at the intersection of Gundaroo and Mirrabei Drive Gungahlin.
|
Partial access
|
6/09/2024
|
N/A
|
54 days
|
N/A
|
N/A
|
| 24-097 (PDF 1.3 MB)
|
25/06/2024
|
Establishment of the criteria of advertising requirements for Canberra buses and light rail
|
Partial access
|
27/08/2024
|
N/A
|
45 days
|
N/A
|
N/A
|
| 24-098 (PDF 2.9 MB)
|
26/06/2024
|
Documents generated or received by the ACT Government in relation to the decision to remove the 4-seater spring toy and the playground sign at the Newbery Crescent Playground in Page
|
Partial access
|
06/08/2024
|
N/A
|
29 days
|
N/A
|
N/A
|
24-101 (PDF 1.2 MB)
|
03/07/2024
|
Records between 2018-20 relating to the footpath and pedestrian crossing located in the vicinity of 175 Anketell Street in Greenway
|
Full access
|
09/08/2024
|
N/A
|
27 days
|
N/A
|
N/A
|
24-103 (PDF 79.2 MB)
|
08/07/2024
|
Access to information on projects: Brindabella Road and Boboyan Road as mentioned in The Riot ACT on 8 July 2024
|
Partial access
|
21/10/2024
|
Waived
|
75 days
|
N/A
|
N/A
|
24-105 (PDF 2.1 MB)
|
10/07/2024
|
Black spot program for the last 10 years
|
Partial access
|
19/09/2024
|
Waived
|
52 days
|
N/A
|
N/A
|
24-106 (PDF 1.7 MB)
|
12/07/2024
|
All communication and records which mention the "Inter-town Public Transport route"
|
Partial access
|
23/08/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-107 (PDF 606.2 KB)
|
12/07/2024
|
Copy of documents regarding 191 Anketell Street Greenway ACT 2900 from 29 May 2022 to 5 years prior
|
Partial access
|
23/08/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
| 24-113 (PDF 278.1 KB)
|
05/08/2024
|
Information about the functions of licencing and compliance, regulations and enforcement of various acts.
|
Full access
|
13/09/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
| 24-114 (PDF 7.2 MB)
|
07/08/2024
|
Records relating to the meetings of the Animal Welfare Advisory Committee 2022-24
|
Partial access
|
30/09/2024
| Waived |
38 days
|
N/A
|
N/A
|
24-117 (PDF 1.9 MB)
|
2/07/2024
|
Any analysis that was undertaken of impacts to traffic flows prior to approving and installing new traffic lights at the corner of Limestone Ave and Treloar Cres.
|
Partial access
|
10/09/2024
|
N/A
|
50 days
|
N/A
|
N/A
|
24-120 (PDF 703.8 KB)
|
19/08/2024
| Request for [Pruning - Shops 16 Barker Street, Griffith] reference number [00945921]. Full copy of conservators report assessing the tree. |
Partial access
|
26/09/2024
|
N/A
|
28 days
|
N/A
|
N/A
|
24-124 (PDF 718.1 KB)
|
24/08/2024
| All file notes, letters, memoranda and approvals (Permits/ Instruments) relating to the burial of the late Archbishop Francis Patrick Carroll in the crypt of ST Christopher's Cathedral, Manuka in early 2024. |
Partial access
|
8/10/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-128 (PDF 394.1 KB)
|
01/09/2024
| 1. MyWay+ contract with NEC and costings of the project. 2. Other contractors/vendors and their offers. | Refusal |
14/10/2024
|
N/A
|
29 days
|
N/A
|
N/A
|
24-131 (PDF 10.4 MB) |
13/09/2024
|
Information regarding a pothole located in the car park outside of Chifley Grocer (SHOP 12 TO 14/20-22 Chifley Pl, Chifley ACT 2606).
|
Partial access
|
24/10/24
|
N/A
|
28 days
|
N/A
|
N/A
|
24-132 (PDF 2.4 MB)
|
16/09/2024
| A copy of any arborists reports and/or accompanying documents relating to the removal of trees on the corner of Brisbane and Wentworth avenues |
Partial access
|
28/10/24
|
N/A
|
29 days
|
N/A
|
N/A
|
24-133 (PDF 5.2 MB)
|
16/09/2024
|
A copy of any agreement between Riverview Group and Transport Canberra relating to the provision of bus services to Ginninderry and any associated conditions or alterations to this agreement
|
Partial access
|
19/11/2024
|
N/A
|
45 days
|
N/A
|
N/A
|
24-134 (PDF )
|
16/09/24
|
All complaints received through regulated channels including fix my street for regulated illegal activities enforced by TCCS through LPR and or physical engagement “human operator” opposite the following abodes
|
Full access
|
25/10/24
|
N/A
|
29 days
|
N/A
|
N/A
|
24-136 (PDF 1.0 MB)
|
16/09/24
|
Data relating to tree activity applications from (1) 31 December 2022- 31 December 2023 and (2) the period since 1 January 2024 – 16 September 2024.
|
Full access
|
28/10/24
|
N/A
|
26 days
|
N/A
|
N/A
|
24-144 (PDF 13.3 MB)
|
09/10/2024
|
All records relating to TTW Engineers' proposals for waste management and collection, Block: 25, Section: 43, Suburb: O'Connor.
|
Partial access
|
19/11/2024
| Waived |
29 days
|
N/A
|
N/A
|
24-145 (PDF 20.9 MB)
|
14/10/2024
|
Information relating to disability wheelchair access.
|
Full access
|
18/11/2024
|
N/A
|
25 days
|
N/A
|
N/A
|
24-146 (PDF 762.5 KB)
|
14/10/2024
|
Information related to passengers travel on ACT buses
|
No documents
|
25/11/2024
|
N/A
|
30 days
|
N/A
|
N/A
|
24-151 (PDF 526.8 KB)
|
23/10/24
|
Any correspondence between the ACT government and Gungahlin United regarding the money they owe to the government and the agreed repayment plan for that debt
|
No documents
|
03/03/2025
|
N/A
|
91 days
|
N/A
|
N/A
|
24-155 (PDF 350.1 KB) |
01/11/2024
|
(1) All applications made under Section 25 of the Public Unleased Land Act 2013 ; and (2) The response of the TCCS Director General (or his delegate) to each of those applications. For the period 01-Jan-2023 to 01-Nov-2024
|
No documents
|
09/12/2024
|
N/A
|
26 days
|
N/A
|
N/A
|
24-159-160 (PDF 524.0 KB) |
13/11/24
|
Fix my street and any works pertaining to the shared pathway adjacent too Atherton Street and federal highway and between Phillip Avenue and the Barton Highway
|
Partial access
|
09/01/2025
|
N/A
|
35 days
|
N/A
|
N/A
|
24-168 (PDF 465.7 KB) |
21/09/2024
|
Any complaints in relation to the trees on the corner of Linger Place and Alfred Hill Drive, Melba
|
Partial access
|
20/01/2025
|
N/A
|
39 days
|
N/A
|
N/A
|
24-169 (PDF 858.3 KB)
|
21/11/24
|
All records relating to the maintenance, upkeep, monitoring, and repair of the footpath located in the vicinity of Howitt Street, Kingston
|
No documents
|
19/02/2025
|
N/A
|
28 days
|
N/A
|
N/A
|
24-170 (PDF 16.6 MB) | 25/11/2024 | All records held by TCCS regarding any development proposed for Block 2 of Gungahlin Section 11 | Partial access | 09/05/25 | N/A | 113 days | N/A | N/A |
24-171 (PDF 2.9 MB) 24-171 (XLSX 1.2 MB) | 26/11/2024 |
Design, maintenance, monitoring of wooden gate on Mount Taylor Reserve
| Partial access |
26/02/2025
|
N/A
|
60 days
|
N/A
|
N/A
|
| 24-174 (PDF 13.8 MB)
| 28/11/2024 | Feedback and status reports relating to MyWay+ testing and launch | Partial Access | 14/03/2025 |
Waived
|
69 days
|
N/A
|
N/A
|
24-175 (PDF 23.1 MB)
|
2/12/24
|
Operation manual of the bus model Yutong ZK6131HG1
| Partial access |
13/02/25
|
N/A
|
30 days
|
N/A
|
N/A
|
24-176 (PDF 450.2 KB) |
02/12/2024
|
Decision maker name in TCCS who is authorised to make decisions under: Control 26(d) of Planning (Exempt Development)
|
Not applicable
|
14/01/2025
|
N/A
|
24 days
|
N/A
|
N/A
|
24-177 (PDF 14.1 MB) |
03/12/2024
| Formal advice to the ACT Government and relevant Ministers on the transition to MyWay+ |
Partial access
|
14/03/2025
|
Waived
|
70 days
|
N/A
|
N/A
|
24-181 (PDF 7.5 MB)
|
09/12/2024
|
Applications by Canberra Sand and Gravel for a licence to occupy the land, inspection of land etc of Block 3 Section 45 and 65
| Partial access |
14/03/2025
|
Waived
|
62 days
|
N/A
|
N/A
|
24-183 (PDF 5.7 MB)
|
17/11/2024
|
The implementation of MyWay+
| Full access | 27/02/2025 |
N/A
|
67 days
|
N/A
|
N/A
|
24-184 (PDF 293.7 KB)
|
11/12/2024
|
Contracts awarded to dsb Landscape Architects and tender submissions since 2015
| No documents | 26/02/2025 |
N/A
|
49 days
|
N/A
|
N/A
|
24-186 (PDF 1.7 MB)
|
13/12/2024
|
Approximate cost of the [MyWay+]and paid by FYs in which these amounts were paid, expected annual costs.
|
Full access
|
20/03/2024
|
N/A
|
62 days
|
N/A
|
N/A
|
24-187 (PDF 1.5 MB)
|
13/12/2024
|
All records relating to the maintenance, upkeep, monitoring, and repair of the footpath located in the vicinity of 23 to 25 Cox Street, Ainslie ACT 2602
| Partial access |
24/02/2025
|
N/A
|
44 days
|
N/A
|
N/A
|